What will it cost?
What is the payback?
•How much will it cost?
•
•To fund detection and generation experiments (Phase 1 & 2) for proof of concept:
•Plans and Specifications 4 Million
•Fabrication 6 Million
•Test 5 Million
•Cushion 5 Million
–Proof of Concept Phase       20 Million (for both experiments)
•
•HFGW FTS Infrastructure Development,  Phase 3:
–Development of HFGW FTS receivers for cell phone use 25 Million
–Manufacture of  cell phone HFGW FTS receivers 25 Million
–Four stations @ 25 Million each 100 Million
•
•Total Developmental Cost (Phases 1,2,& 3)        170 Million
•
•How much and how will it pay back?
•
•Licensing and Technical Support:
–5% of 50 Billion  in 10 years or  2.5 Billion
The first two phases will establish the proof of concepts required to validate both the detection concept and the generation concept.

Phase 3 with productize the detector to shrink it into a size useful for telecom deployment, and will pay for fielding the ground based generators.

Fees on licensing the FTS standard would be the profit source for the HFGW FTS service.